RAYMOND W.
JOHNSTON, Jr.
Profile: Successful project leader with extensive expertise in managing the software
development process from requirements analysis through product deployment,
specializing in quality assurance processes and procedures. Versatile
self-starter with careful attention to detail that has experience in the
defense, commercial and non-profit sectors. Skilled in working with and shaping
corporate best practices to achieve project and corporate goals.
Valued Traits:
· Proven ability to successfully motivate and manage multi-functional teams in diverse environments
· Extensive experience in establishing and maintaining SQA plans and processes for organizations
·
Experience with both manual and automated
Mercury testing tools (
· Adept in configuration management and baseline control
· Extensive work with the Rational Unified Process (RUP), Software Engineering Institutes’ Capability Maturity Model (SEI CMM), Total Quality Management (TQM) and other process improvement initiatives
· Excellent requirements analysis/tracking and documenting skills
Professional
Experience:
Feb. 2007 –
Present Comcast
Consultant
Performance Testing
Lead
·
Developed Test Strategy and Test Plan documents
for numerous performance testing projects
·
Created project plans for testing efforts
·
Performed load, stress, surge, endurance,and failover
testing on numerous projects utilizing HP LoadRunner
·
Worked with project teams to analyze results and
perform system tuning
·
Responsible for establishing the performance
testing environment
·
Helped deploy and configure
·
Trained and mentored numerous employees and
consultants on the performance testing process and the tool
HP
·
Instrumental in rolling out
·
Worked on the migration and roll out of
· Customized the tool for numerous projects. This included helping to define and add fields, updating the workflow using the script editor.
· Trained the staff on the use of the tool
· Aided staff in the use of the tool for User Acceptance Testing (UAT)
·
Exported Test Cases in Excel format into
· Generated reports to track coverage, test execution, and defect status for management
Senior Quality
Analyst
· Wrote Test strategies, Test plans, and End of Phase Test Summaries
· Mentored the staff on the use and content of these documents
· Created and maintained project plans for several projects
· Wrote numerous training documents used for knowledge transfer
Business Mediation
Service Layer Project
· Learned the HP ServiceTest tool for SOA functional testing a new Service Layer that interfaced with numerous front-end applications and the back-end billing systems
· Implemented and executed test cases in an Agile-like environment
· Helped in the reporting of the results
· Implemented and chaired the daily Configuration Control Boards (CCB’s) for defect management.
InStranet Contact
Centers In-Line
· Gathered information from various resources to create the Test Strategy for performance testing a Knowledge-based system used by customer support personnel
· Identified the type of performance testing needed, based on limited requirements
· Quickly set up a test environment, developed test cases, and executed load, stress, and endurance test
· Provided daily status to the management team, which resulted in a ship decision based on tangible acceptance criteria
· Helped to organize, coordinate and present the QA organizations performance testing approach to the CIO
Comcast Integrated
Financial Application
· Coordinated the performance testing efforts for the two tier Oracle forms application with numerous parties
· Created the Test Strategy for performance testing effort
· Overesaw the development of the test cases in Vugen using the Oracle NCA and Web protocols
· Created the test scenarios using the HP/Mecury Load Controller, executed test scenarios and performed the data analysis using the HP/Mercury Analysis tool
· Communicated the progress of the testing effort to the management team
Oct. 2006 – Feb.
2007 Taylor Geoservices, Inc.
Consultant
·
Helped define the requirements, the database schema,
and the network architecture for a GIS storm water management system for the
State of
· Contributed in the initial proposal to the PA Department of Environmental Protection.
· Developed a prototype of the system for the next phase of the project.
Web page Development
· Developed web pages and provided technical assistance to various small organizations.
Jan. 2005 – Aug.
2006 Vertex, Inc.
Test Project
Manager (Mar. 2006 – Aug. 2006)
O
Series Project
Reported
to the Director of Software Test Engineering and managed the testing and
release efforts for the company’s
· Helped to set the scope for deliverables, the products’ acceptance criteria, and insured that adequate testing was performed prior to system release
· Introduced more extensive platform testing by automating the manual Mercury Quicktest Pro test sets
· Provided better reporting and metrics to stakeholders by using the Mercury Quality Center Dashboard
· Oversaw the successful delivery of a major system release while coordinating several on-time legacy product releases. The on-time delivery resulted in an additional 300K in revenue.
· Coordinated the efforts of the ten member testing team while acting as the liaison between the Architecture, Development, Customer Relations, Data Management, and Business Analyst teams.
· Coordinated development of test strategies and helped develop test plans.
· Negotiated with resource managers for testing personnel.
· Liaison to the Program Management team, which was responsible for reporting on portfolio and segment status to the Corporate Leadership Team.
Test
Designer/Test Project Manager (Sept. 2005 – Mar. 2006)
eFile
Project
Efile was Vertex’s’ first web-based electronic filing solution for IRS corporate filings.
· Worked closely with the business analyst on the requirements analysis and to insure that testable requirements were being created.
· Designed and developed test strategies, test cases and test plans for the eFile transmission portal to verify and validate stakeholder and customer requirements.
· Managed testing schedule and was the testing organizations liaison to the Development, Business Analyst, Program Management, and other organizations to coordinate efforts and facilitate cross-functional communication.
· Utilized SCRUM Project Management techniques to increase issue awareness and have quicker problem resolutions.
· Implemented weekly Change Control Board (CCB) meetings to assess severity and prioritize fixes.
· Instrumental in getting the EFile web portal hosted by a 3rd party provider and helped to establish the necessary environments for the development, quality assurance, and integration teams.
· Authored the procedures for the operation in these environments that were SAS-70 compliant.
Senior
Quality Analyst (June 2005 – Sept. 2005)
Process Improvement Initiative
· Served as a lead member on a team chartered to establish a sound infrastructure for the testing and verification (T&V) organization. The over-arching task involved tailoring and implementing the Rational Unified Process (RUP) for the organization.
· Primary responsibility was to help establish configuration management processes and procedures. This involved evaluating various technologies, writing technical recommendations, implementing tool sets, and documenting and training end-users.
· Worked peripherally in helping to define the organizational structure, and on the metrics and reporting to be presented to the T&V stakeholders.
· Researched, evaluated and authored technical recommendations to make the testing process more efficient and cost effective
· Worked on the re-engineering effort of the testing organization
Quality
Analyst (Jan. 2005 – June 2005)
Test Environment Management
· Analyzed the problems that resulted in lag time during the testing phase, evaluated tools to improve efficiencies, and implemented a solution on multiple product lines that significantly shortened, by days to weeks, the testing effort for the software quality analyst.
1998 – 2004 Mosaic System
Solutions, Inc.
SIF allows disparate K-12 educational software to communicate via a common server. Developed consulting services to introduce the Schools Interoperability Framework (SIF) initiative to K-12 schools to improve efficiency and reduce the redundant data produced from the wide variety of K-12 software applications on the market.
· Created a comprehensive Project Management Plan
· Researched K-12 software applications,
· Learned the SIF protocol
· Contacted and presented to school districts to determine and evaluate the district’s needs
1992 – 2002 Police
Foundation
· Successfully redesigned, implemented and deployed the RAMS II, which is a patented Decision Support System that includes an Early Warning System and Data Mining facility for Law Enforcement agencies.
· Worked with subject matter experts to formalize requirements used to implement the RAMS II.
· Spearheaded the technical task to get the system patented.
· Expanded the use of RAMS II from two to ten cities under my direction.
· Authored numerous documents on system design, the engineering process and Quality Assurance.
· Evaluated new technologies to best meet end clients’ and Police Foundations’ needs. This system helped, save communities millions of dollars in lawsuits due to officer misconduct.
· Designed and developed the statistical component for the initial RAMS system and was responsible for creating the deployment tools.
1999 – 2001 American Psychological
Association
Consultant
·
Reviewed and refined customers’
requirements for a customized patient/therapist database contact management
system.
·
Recommended the use of
a commercial product that could be tailored to their needs. This decision saved
thousands of dollars in development cost as well as substantial recurring
consulting cost.
1997 – 1999 DIVA Systems,
Inc.
Consultant
The NMS provided a solution for the DIVA Video-on-demand (VOD) server to be remotely controlled saving the cable operators the significant cost of deploying technicians to headends to trouble shoot and correct problems.
·
Actively
worked with the Systems Engineering group to define requirements and write the
Requirements Specification used to build the system.
·
Architected
a system that would incorporate SNMP to remotely monitor and control the VOD
server.
·
Authored
the functional specification for this system as well as numerous white papers
for implementing the SNMP protocol in a VOD environment and pertaining to
Web-based management.
·
Created project schedule to track the progress of the NMS GUI and coordinated it with the other
subsystems being developed.
·
Managed
requirements creep and zero float task throughout the project.
1995 – 1997 General Instrument, Inc.
Headend Controller
·
Saved corporation significant cost by bringing development of remote
control system in house after a one-year overrun by a 3rd party
vendor.
·
Established a Software Control Board to track
software trouble reports.
·
Provided training to users, lead the activities
of the technical publications group, as well as the engineers assigned to the
maintenance phase of the project.
·
Established the escalation procedures for field
problems with the
·
Designed and implemented system test plan and
procedures for testing the application.
1985 – 1995 Lockheed Martin
Corporation
International Space Station Alpha (1993 – 1995)
·
Developed
firmware to test the onboard communications systems for one of the three major
subsystems.
·
Lead the efforts for
the successful and early completion of the acceptance test of all three
subsystems. This resulted in an award fee of $50K from the Prime contractor.
·
Selected to be on
the corporate process improvement team chartered with enhancing the software
development process for the organization.
·
In two years, we
were able to take the Software engineering business unit from an SEI level 1 to
level 3.
·
Developed corrections
to software and implemented new features to the system.
·
Promoted to lead
engineer within two years and was responsible for the timely implementation of
new enhancements as well as co-coordinating the work for up to 10 engineers.
·
Served on the Software
Configuration Control Board, which worked with the customer, and Quality
Assurance to insure timely and accurate solutions were provided.
·
During my tenure at
Lockheed was consistently rated as one of the top engineers.
·
Established a design
and code review process to reduce the chance of trouble reports being
generated.
·
Developed training
course for new engineers. Utilized the Constructive Cost Model (COCOMO) to
estimate the cost of system enhancements.
EDUCATION:
Degree: B.S. Science, December 1984
PERSONAL:
· Member IEEE Computer Society
· Member PMI