Randall
Harkness
4820
Clipping Court
Louisville,
KY 40241
Home:
(502) 228-3104 Cell: (502) 387-3194
Email: reharkness@insightbb.com
SEEKING OPPORTUNITY
Seeking SAP R/3 contract opportunity as an Enterprise
Resource Planning (ERP) functional consultant.
PROFILE
Senior SAP Cross Applications Consultant with more than ten
(10) years of SAP R/3 experience in product selection, Business Blueprint,
system design and configuration in the Quality Management (QM); Production (PP
& PP-PI); Plant Maintenance (PM); and Materials Management (MM) modules. Possesses expert industry background in
Quality, Production, Demand and Capacity Planning, Materials Management, Plant
Maintenance all of which have provided a solid foundation for R/3 systems
design, configuration and integration of Inventory Management, MRP, Facilities
Management, Quality Management and Shop Floor processes. More than thirty-six (36) years of
manufacturing – discrete, process, repetitive, lean – coupled with SAP
expertise, contribute to ability to make strategic business recommendations
concurrent with the configuration of the SAP system. Client experience also includes documentation, requirements
analysis, master data requirements, system interfacing, post implementation
support, troubleshooting, and development and delivery of end-user training
(EUT). Dedicated, Go-To Business
Professional with excellent interpersonal and communication skills.
Industry background includes broad Business Process
Re-engineering utilizing integrated business and manufacturing modules in
several manufacturing facilities across North America.
Twenty-one (21) years of ERP experience.
Twelve (12) years in manufacturing management as foreman,
production and inventory control manager, materials manager and plant superintendent
followed by more than twenty-four (24) years of information technology in
various roles ranging from Programmer/Analyst to Manager of Information
Services for North America for a major chemical manufacturer. Proven project management skills, and demonstrated
ability in leading a team in the successful delivery of applied
technology. Eleven (11) years SAP R/3
consulting experience.
QUALIFICATIONS
·
Senior QM, PP-PI, PP, PM & MM Consultant
·
Eleven (11) + years of SAP experience in Cross Applications Consulting
·
Expert in SAP R/3 QM, PP-PI, PP, PM & MM.
·
Automotive OEM & Tier 1 Automotive Supplier industry
experience
·
Thirty-six (36) years in discrete, lean, process &
repetitive manufacturing environments with experience in Automotive, Chemicals
and Diversified Foods / Food Processing Industry, Defense
·
Accelerated SAP Implementations & Upgrades
·
Seven (7) + Full Project Lifecycle Implementations; Two (2)
Upgrades
·
Career background in Automotive Materials
Management/Handling; Shop Floor Production, Scheduling and Planning; Plant
Maintenance; Inventory Management; Strategic Planning; Supply Chain and
Materials Management & Planning; Quality; and IT Management in various
manufacturing & high volume production environments
·
Core R/3 Strengths:
o
QM – Quality in Procurement, Quality in Production, Quality
in Sales & Distribution
o
PM – Planned/Preventive Maintenance, Equipment Calibration,
Equipment Inspection, UOM, Counter/Performance based Maintenance, Maintenance
Orders, Data Archiving, etc.
o
PP / PP-PI – Capacity/Demand Planning, Demand Management,
Recipes/Routings, Control Recipes, Process Instruction Sheets, Electronic Batch
Records, Product Costing, Resources/Work Center, Process/Production Orders,
Shop Floor Monitor, PI Interface to 3rd Party Shop Floor Control
Devices, MRP, S&OP, Order Execution, Scheduling, Backflushing, etc.
o
MM – Purchasing, Invoicing, Master Data, Inventory
Management, Batch Management, Material Movements, Availability Checking,
Physical Inventory, Cycle Counting
o
DMS – ECM, Document Types, Document Vaulting/Linking, Change
Master, etc.
o
WM – configuration in most components
o
Cross-Applications – Full Integration, Business Blueprint,
BPPs, Unit Testing
o
Technical – ABAP Query, Developer’s Workbench, Managing ABAP
Development
·
SAP Team Leader experience
·
SAP Industry Solutions:
IS-Automotive
·
Extensive Functional Specifications Development
·
SAP Curriculum Development, Project Team and End User
Training delivery
·
Taught SAP America Partner Academy PP (5-week) Certification
course
·
Specializes in ASAP Methodology, Gathering Business
Requirements, Business Blueprinting (BBP), Gap Analysis, Course Design,
Classroom Training, Documentation, Report Design, Design of Decision Support
Applications, Supervision of ABAP/4 Programming Development, Data Loading from
Legacy systems to SAP, Data Archiving, Query, Developer's Workbench, Data
Browser
·
U.S. Citizen
PROFESSIONAL SAP EXPERIENCE
Project:
Rolls-Royce, Indianapolis, IN
SAP QM Consultant
(December 2006 – Present)
Project:
Matthews International, Richmond, IN
SAP Project Leader
(February 2006 – December 2006)
·
Implemented corporate SAP design, which included FI-CO, MM,
PP and SD at Milso (a newly acquired company).
·
Mapped business processes to design.
·
Identified legacy data and loaded in SAP.
·
Made adjustments to configuration as required.
·
Delivered Training
·
Accomplished implementation on time and within budget.
·
Provided post go-live support.
Project: U.
S. Army – R/3 4.6c – Maintain and Remanufacture Military Assets
SAP Consultant
(December 2003 – February 2006)
U.S Army Logistics Modernization Program (LMP) efforts are focused on modernizing the U.S. Army Materiel Command (AMC) at the national level. LMP will provide agile, reliable and responsive services by leveraging best practices and technology that enable AMC to deliver world-class logistics and readiness to the warfighter.
The goal of the modernization effort is to reengineer the current national level logistics business processes, facilitated by SAP, to provide integrated, seamless, flexible information management services in support of the Army's logistics mission. The goal is not to just enhance the current process, but rather to employ creative solutions that best leverage commercial technological advantages; i.e., the modernized services will leverage the advantages of using commercial software with large customer bases. The intent is to achieve a functional architecture capable of meeting immediate business requirements, as well as having the flexibility to accommodate emerging requirements while evolving with the commercial marketplace. This will result in quantifiable improvements in materiel management, weapon systems management, customer service levels, and readiness.
This program is one of the largest SAP implementations undertaken and considered by SAP to be top-5 worldwide in complexity and criticality. In addition to the Modernization component, which focuses on realization of the to-be SAP solution, the program also includes sustainment of the major legacy applications that will be replaced by the modernized solution. Total program staff exceeds 600 resources.
I am working on the Computer Sciences Corporation (CSC) Team from Bearing Point/MyITgroup as a SAP QM, PS, PP, MM Functional and Training Consultant.
Assignments
· LMP IBTO Master Production Scheduling (MPS):
o Developed “best practice” course for Maintaining Inventory Accuracy.
o Developed “best practice” course for Maintaining Order Accuracy.
o Delivered training to Tobyhanna Army Depot.
· LMP 2nd Deployment Expert User Program (EUP):
o EUP Lead for QM, PS and PP at Letterkenny Army Depot.
· LMP 2nd Deployment Training Team:
o As Lead, managed and "owned" the training courses for the QM, EHS and HR portion of the LMP training solution.
o Provided daily metrics on course development.
o Configured/Corrected Training System environment.
o Ensured exercises for the solution are complete and functional.
o Wrote training content, which included procedures, job aids, quick references, process flows, simulations, exercises, lesson plans, etc.
o Ensured data requirements were accurate and loaded data in the training client.
o Transferred knowledge to instructors and other project personnel and incorporated their feedback.
o Conducted classroom instruction.
o Adhered to schedule to ensure delivery of course material.
o Provided first line of support to instructors for LMP solution.
o Worked with Curriculum Development Lead to manage scope and modify course material based on feedback from functional teams and government Subject Matter Experts (SMEs).
·
U.S Army Industrial Base Task Order (IBTO):
o As QM Lead, visited and analyzed business processes and procedures at U.S. Army depot sites at Corpus Christi, TX; Red River, TX; Anniston, AL and Letterkenny, PA in preparation for the blueprint.
o Prepared QM blueprint and assisted with MM blueprint using ASAP Methodology for Logistics Modernization Program (LMP).
Project:
Visteon, Durant, MS – R/3 4.6c, IS-Automotive 4.6c – Tier 1 Automotive
Supplier
SAP Consultant
(May 2003 – August 2003)
·
At Visteon’s new plant in Durant, MS supplying automotive
assemblies to Nissan and Visteon in Canton, MS, identified and resolved major physical
inventory issues surrounding a 50% production capacity leading to building 400
new vehicles per day.
·
Performed analysis, identified the issues/gaps, prepared an
action plan, and designed/delivered training.
·
Effected functionality changes in MM, PP and SD, which
included Scheduling Agreements, Inbound Deliveries, Goods Receipts,
Backflushes, Kanban, Repetitive Manufacturing, Transfer Postings, Physical
Inventory, Inventory Management, MRP, Control Cycle Maintenance, Outbound
Deliveries, JIT Monitor, EDI, Product Cost Collectors and BOMs.
·
Added three (3) major transactions – two in PP and one in
MM.
Project: Sara
Lee Bakeries, St. Louis, MO
SAP Consultant
(October 2002 – April 2003)
·
Configured and implemented QM in procurement, Document
Management System, quality notifications, results recording, usage decisions,
vendor audits, reporting and evaluations using ASAP Methodology and international
standards defined in the guidelines on Good Manufacturing Practices (GMP) for
the pharmaceutical and food-processing industries.
·
Used QuickTest Professional to load legacy, master data into
SAP and OnDemand to create tutorials and training documentation.
·
Performed analysis and created ABAP/4 program designs.
·
Facilitated training classes.
·
Assisted reconfiguration of functionality in Warehouse
Management (WM) to support QM.
Project:
Degussa/Dopaco, Philadelphia, PA
SAP Consultant
(August 2002 – September 2002)
·
Provided temporary training assistance to two clients of ICM
America
·
Designed and delivered training courses in QM version 4.6c.
·
Delivered an eight-day course at Dopaco.
·
Delivered nine days of QM training at Degussa in Mobile, AL.
·
Both courses were very successful and well received.
Project:
Century Aluminum, Hawesville, KY
SAP Consultant
(November 2001 – July 2002)
· Evaluated and blueprinted the new Plant Maintenance design.
· Configured and implemented PM.
· Recovered and mapped data from legacy, FoxPro applications to SAP including Functional Locations, Equipment, hierarchies, Bill of Material, Maintenance Plans, Maintenance Orders and Maintenance Plans.
· Created CATT Scripts and programmatically loaded the FoxPro master data into the SAP design.
·
Created multi-dimension maintenance strategies.
·
Consolidated three plants from an earlier disjointed
implementation in which each department was operating as a separate plant, into
one integrated plant by rearranging all Master Data.
·
Configured Production Planning and Execution (PP-PI),
Quality Management (QM), and migrated the data from three plants into one
plant.
·
Delivered oral and written presentations.
Project:
Astaris, St. Louis, MO – 4.6c QM, PP-PI ASAP
PP-PI & QM Team Lead
Consultant
(May 2000 – August 2001)
·
Quality Management (QM) Team Lead for full lifecycle
implementation.
·
Used international standards defined in the guidelines on
Good Manufacturing Practices (GMP) for the pharmaceutical and food-processing
industries.
·
Assumed PP-PI Team Lead role and provided a smooth
transition to the new PP-PI Team Lead.
Project included Batch Management, MRP, Demand Management and master
data such as Recipes, Work Centers and Bill of Material.
·
Utilized Plant Maintenance (PM) for equipment calibration
and equipment inspections.
·
The project created one computing system to merge corporate
activities and multiple plants for the new company formed as a joint venture
between FMC and Solutia (spun-off from Monsanto).
Project:
Nokia, Toronto, Ontario, Canada - 3.1i to 4.5b Upgrade
SAP Consultant
(January 2000 – March 2000)
·
Member of cross-functional team.
·
Updated training documentation preparing for the 4.5b
upgrade.
·
Designed and delivered 4.5b training classes to the users,
provided post-implementation support and resolved open issues.
·
Provided subject matter expertise for Production Planning
(PP) including MRP, Production Control, Demand Management, Master Data and
Capacity Planning.
Project:
Shultz Foods, Hanover, PA – 4.0b QM, PP, ASAP
(June 1999 – December 1999)
·
Utilizing R/3 4.0b and ASAP Methodology, configured Quality
Management (QM).
·
Utilized international standards defined in the guidelines on
Good Manufacturing Practices (GMP) for the pharmaceutical and food-processing
industries.
·
Defined master data requirements, loaded data using CATT
scripts and Excel spreadsheets.
·
Created user documentation and conducted end user training.
·
Configured problem management with quality notifications,
quality certificates using SAPScript for Sales and Distribution (SD)
deliveries, inspection plans, automatic inspection lot creation for deliveries,
purchase order receipts, and production orders.
·
Configured Plant Maintenance (PM) for equipment calibrations
and equipment inspections.
·
Engaged post go-live to re-configure and re-implement
Production Planning (PP) as original QM consultant was unable to implement
Quality Management due to the original PP design and blueprint.
·
Rearranged master data to improve PP operations as well as
implemented QM.
Project:
Nalco Chemical, Naperville, IL – 3.0f PP-PI
(December 1998 – February 1999)
·
Configured PP-PI and created/modified master data for
interface with in-house Process Control System for shop floor integration with
SAP using version 3.0f.
·
Developed and wrote documentation
·
Provided training for Nalco's Visual Basic programmer to
establish communications between SAP and Visual Basic.
Project: SAP
Partner Academy, Oak Brook, IL – PP Trainer
PP Trainer
(January 1999 – February 1999)
·
Requested by SAP America to teach Production Planning (PP)
at Partner Academy.
·
Using release 4.0 curriculum, provided specific training and
product support to fellow consultants required to pass the certification
examination.
Project:
Coca-Cola, Atlanta, GA
(September 1997 – September 1998)
·
Worked on the team at corporate headquarters to help
establish a support organization for additional plants as they go live on
SAP. Used Ernst and Young's Fusion
Methodology.
·
Configuration, master data, implementation and support of
PP-PI, QM and MM.
·
Utilized international standards defined in the guidelines on
Good Manufacturing Practices (GMP) for the pharmaceutical and food-processing
industries.
·
Provided post-implementation support to Lehigh and performed
various projects.
·
Designed prototype, configured, and tested Warehouse
Management.
·
Configured SAP for multiple-plant environment for fountain
manufacturing and proved supply-chain, business processes.
·
Provided analysis and design for ABAP/4 reports and decision
support. Worked with programmers using
the ABAP/4 Workbench. Used SAP Query to
write reports.
·
Re-configured PP-PI because the initial IBM system sizing
study did not provide adequate resources since it did not properly account for
PP-PI.
·
Provided analysis to improve utilization of system
resources.
Project:
Coca-Cola, Lehigh, Pennsylvania
(April 1997 – September 1997)
·
Worked on team to Configure and implement SAP R/3's, version
3.0F, PP-PI, MM and QM, which included master data, training documents, and
training. Used Ernst and Young's Fusion
Methodology.
·
Automated manufacturing, integrating SAP with shop floor
control systems utilizing Sequentia (formerly PID) as the middle-ware
interfacing to Process Logic Controllers (PLCs).
·
Utilized international standards defined in the guidelines on
Good Manufacturing Practices (GMP) for the pharmaceutical and food-processing
industries.
·
A newly constructed plant, Lehigh was brought live on SAP in
August 1997. I was on-site to provide
go-live and post-implementation support.
AKZO Nobel, Columbus, OH
SAP Team Lead
IS Manager
(August 1996 – October 1996)
· Business Unit decision-makers wanted to be assured that a SAP implementation could be done on time and within budget. The prototype for the roll-out had to be completed in 10 weeks, and the design had to realize goals as prescribed by our "Order Fulfillment" chain study produced by the 15 member cross-functional team organized at the plant level in Columbus. The project included modules MM, PP, SD, FI, CO, and QM. Used CPG's Methodology.
·
Served on the configuration team using the Implementation
Guide (IMG) to configure the organizational structure.
·
Served as team lead to configure, prepare master data, and
model the business processes for Material Management (MM) and Production
Planning (PP) including material masters, bill of materials, routings, work
centers, QM data, vendor data, production orders, purchasing, receiving, MRP,
capacity planning, and physical inventory.
·
The prototype was immensely successful completing on time
and within budget. Customer was
extremely pleased and the prototype was approved March 1997 for rollout to all
plants.
AKZO Nobel, Louisville, KY
SAP Consultant
IS Manager
(September 1995 – August 1996)
· While working for AKZO Nobel Information Services, a separate legal entity from AKZO Nobel Coatings, provided consulting and operational services to several Business Units (BU) from offices in Louisville, Kentucky and Troy, Michigan.
·
Began in-house training on SAP R/3 version 2.2 in September
1995.
·
Commenced formal training from SAP in March 1996 on version
3.0.
PROFESSIONAL NON-SAP EXPERIENCE
AKZO Nobel (acquired Reliance Universal) Louisville, Kentucky
North
American Information Services Manager 1993
to 1997
Coatings Business Unit.
Windows programming (Access, C++, C, and Visual Basic). Provide programming, business consulting,
integration services, hardware installation/support, LAN services
(Novell). Support/install Computer
Associates PRMS (AS/400 and RPG/400) and R Shriver/Cardinal/In-house (HP 3000/
COBOL) business packages for twenty manufacturing facilities distributed across
North America. Responsible for two
offices that provide services (Louisville, KY and Troy, MI). Provide leadership
to transition Information Services from a corporate staff function to a
separate entity selling competitive services to the business units. I was responsible for the design of service
offerings as well as budgets and pricing.
AKZO Nobel Louisville,
Kentucky
North
American Information Services Manager 1990
to 1993
AKZO Nobel acquired reliance Universal. Provide programming, business consulting,
integration services, hardware installation/support, LAN services (Novell),
RSA/Cardinal/In-house (HP 3000/COBOL) business packages for twelve
manufacturing facilities distributed across North America. Designed, created, and implemented
Purchasing and Receiving System. I was
promoted.
AKZO Nobel Louisville,
Kentucky
Senior
Programmer/Analyst 1988
to 1990
Designed, programmed, and implemented Physical Inventory,
Finished Goods Management, Master Scheduling and MRP. Installed integrated business package in twelve manufacturing
facilities (HP 3000, MPE/IX, and COBOL).
I was promoted.
AKZO Nobel Louisville,
Kentucky
Programmer/Analyst 1984 to 1988
Designed, programm