|
|
Desire a contract opportunity as a SAP R/3 QM Team Lead
/ Functional Consultant.
|
|
|
Over eight years of ERP experience with SAP in
Quality Management (QM) in the Petrochemical, Food Chemical and
Pharmaceutical Industries. I have
successfully performed all required duties as a functional QM resource as
well as QM Team Lead for various primary vendors as mentioned below.
SAP Experience consists
of internal and contract consulting and support of SAP QM. Implementation of 3.0C with an upgrade to
3.1I, full cycle implementation of 4.6C and 4.7, implementation of QM for
existing 4.6B and 4.6C installations.
Hands-on experience in blueprinting, QM configuration for QM in the
process industry and repetitive manufacturing, QM in procurement,
production, and sales & distribution.
I successfully implemented several functions including quality planning,
quality inspection, sampling, quality certificates, and quality
notifications. I have experience in the interfacing of StarLIMS with the QM
module. I have experience in legacy
data organization and transfer, CATT scripts, organizing and creating QM
master data, writing and presentation of training documentation and post
implementation support. Experience
in integration points of other functional areas including BM/MM, SD, IM/WM,
and PP.
I have successfully completed training through SAP
Educational Services for the following courses: LO705 Quality Inspection (3
days), LO710 Quality Notification (3 days), LO721 QM in the Process
Industry (3 days), LO725 QM in SD / Quality Certificates (2 days).
Business experience includes 8 yrs of QM leadership
responsibilities with process manufacturing and quality assurance management
assignments. Four years CPG LIMS
laboratory database administrator.
|
|
|
12/2004
5/2006 Shire
Pharmaceuticals Baltimore,
MD / Chesterbrook,
PA
SAP QM Team Lead
I was contracted as the QM Team Lead for this project
that was managed and implemented by IBM Business Consulting Services. As the QM Team Lead, I organized and lead
the QM team through blueprinting, realization, testing/validation, cutover
and go-live activities. Among the
tasks that I completed were process analysis and mapping, configuration, final
testing, QM documentation and validation.
The QM processes included sampling using WM, inspection and digital
signatures. Quality Notifications
were designed for use in product and customer complaints, vendor audit
recording and Quality Info records for vendor control.
Final cutover activities included static data validation
and loading. I lead the post cutover
support of quality planning, inspections utilizing sample drawing procedures
for physical samples, and enhanced quality notifications using workflow.
|
|
|
5/2004
8/2004 Celanese,
Acetate Division Dallas,
TX
SAP QM Consultant (Contractor)
I successfully configured the QM system in a SAP 4.7
environment. I was responsible for the
configuration of output and profile determinations, and implementation of
certificates of analysis. I created
CATT scripts to successfully load all output determination and profile
determination records. I gathered
requirements and created functional requirement documents for certificate
enhancements and quality data file interfaces.
I completed my assignment with post-implementation
support, trouble shooting and the completed documentation of all
configuration, transports and enhancements that I performed.
|
|
|
11/2002
4/2004 Wyeth
Pharmaceuticals Rouses
Point, NY / Phila., PA
/ Carolina, Puerto
Rico
SAP QM Consultant (Contractor)
Full implementation of SAP 4.6C in the Wyeth, Rouses
Point and Carolina, Puerto
Rico manufacturing facilities.
I was contracted through SAP America
to assist in legacy data organization and to successfully implement the QM
module with quality planning, inspections, digital signatures, audit
trails, and batch status management.
Performed post implementation support.
Additional experience from assisting other functional
areas in terms of integration points for MM/IM, WM, PP and specialized
reporting functions for inventory and quality release controls. QM sampling using general WM transactions.
Additionally, I worked as a member of the training
development team successfully developing and delivering the core QM
training curriculum.
|
|
|
2/2002 8/2002 Chevron Phillips
Chemical (CPC) Houston,
TX
SAP QM Consultant (Contractor)
I worked with CGEY to install
QM in an existing SAP 4.6b installation.
The legacy LIMS system was retained.
I successfully implement the QM module for transfer of quality data
from LIMS to SAP and to control inventory for distribution according to
manufacturing and customer specifications using batch determination.
I successfully implemented
the QM module and developed a custom interface for the non-certified StarLIMS
system.
I set up the QM
configuration, developed the certificate forms specifications to
consolidate over 40 legacy forms, participated as a team member for data
extraction, clean-up, and loading.
Wrote and used CATT scripts for some legacy master data. I wrote and presented training documents
for the QM functions.
I have exposure and some
experience in cross-over functions such as SD and MM in terms of customer
specifications (batch search strategy), custom reports, reason codes for
material movements, and customer groups.
|
|
|
8/2001 2/2002 Astaris Lawrence,
KS
SAP 4.6C Central Support (QM)
Functioned as the SAP
Application Specialist QM/ADC for Astaris LLC. Astaris is a chemical manufacturer and
uses SAP for a Process Industry. I
was assigned the role of QM primary support for the Astaris enterprise. My duties were focused on issue
resolution from post go-live and phase 2 enhancements.
Post go-live support
included monitoring and resolving issues.
Internal consulting for design issues and extensive troubleshooting
of master data, using all available resources such as programming, basis
and functional teams as well as the SAP Solution Manager.
Phase 2 enhancements
included improved inspection plan design for specific process requirements,
initiating and follow up of requested programming, long term inspection and
incorporating plant maintenance for calibration inspection.
|
|
|
6/2000 8/2001 Astaris Lawrence, KS
SAP
4.6C Implementation Project
Approximately
half of the company was using SAP 3.1I and the other half was using a
proprietary package. The
implementation was approached as a new install of SAP 4.6C.
As
an Astaris employee I was appointed to the role of PTM (Process Team
Member) for the QM (Quality Management) module, to work full time on the
implementation of the SAP 4.6C project.
This was the company wide lead role for the QM module.
I
successfully unified diverse plants, work cultures and quality measurements
in developing a workable SAP solution.
Organizing and facilitating weekly teleconferences, periodic
presentations and end user training were among my duties. As the PTM, it was my responsibility to
engage the participation and support of the Astaris laboratory personnel
across the enterprise.
My training and experience include:
QM training through SAP Educational Services.
Using ASAP methodology, I gathered data from the
various sites for blueprinting the design of the final product. In turn I created FDS (Functional Design
Specifications), wrote BPP (Business Process Procedures), prepared
functional testing scenarios and took the lead in developing and writing
the QM training documentation.
I performed the standard and custom configuration in
SAP QM. I executed configuration
troubleshooting as necessary in preparation for module and integration
testing.
I developed the master data for module and integration
testing.
Worked closely with the data team to extract data from
incompatible legacy systems into an Excel format. Lead the plants in
cleaning and modifying the master data in preparation for the data load
into the production system. I
successfully met the challenges presented by the various QM groups in
addressing the data with their limited resources and some negativity.
Conducted onsite training for end users with various
backgrounds in computer literacy.
|
|
|
2/1997 6/2000 FMC Lawrence,
KS
SAP 3.0C / 3.1I QM Support (As
Lab Coordinator)
As primary SAP QM support
for the Lawrence facility, I
maintained all QM master data.
Worked closely with the central support team in the Philadelphia
location to resolve master data and basic design issues of our system.
I handled all of the QM
training for the site for existing employees and all newly hired during
this time frame. I developed
additional training documents to facilitate the training of the newly
hired.
I received a great deal of
exposure to cross-functional areas such as Shipping and Distribution (SD),
Plant Maintenance (PM) and Inventory Management (IM).
In 1998 I tested the QM
master data and configuration for the upgrade project from version 3.0C to
3.1I.
|
|
|
11/1995 1/1997 FMC Lawrence,
KS
SAP 3.0C QM Implementation
Team (As Lab Coordinator)
For my first full
implementation of SAP, I was appointed to the role of the Lawrence
site QM lead. My experience was
quite vast. As a member of the QM
team, my responsibilities were:
To catalogue
the Lawrence quality systems in
preparation for blueprinting.
I handled the
entire QM data scrubbing for the Lawrence
facility.
On hands training for master data creation and
integration.
Created all of the necessary master data that was not
part of the data load.
Attended outsourced train the trainer program (3
days).
Assisted in development of the training documentation.
I was the sole QM trainer for the Lawrence
facility.
I traveled to two other FMC sites, (Green
River WY. And Carteret NJ.), on multiple
occasions to aid in their training and process troubleshooting.
I was part of the post go-live issues resolution team
for issues regarding Certificates of Analysis and master data.
|
|
|
1993 - Present FMC/Astaris Lawrence,
KS
Technical Specialist / Laboratory Coordinator
Created CofAs and maintained Lawrence
master data through CPG LIMS.
Customer interaction including customer inquiries and
customer complaints.
Played a major role in creating, organizing and
maintaining Laboratory ISO 9002 documents.
Performed scheduling and day-to-day work assignments for
lab technicians.
Eight-month assignment as Acting Chief Chemist.
Implementation of SAP QM module for FMC Lawrence.
Eight-month assignment as production Team Leader.
Awards received: Excel Award and Quarterly Excel Award
for Acting Chief Chemist, Excel Award for SAP implementation.
|
|
|
1986 - 1992 FMC Lawrence,
KS
Laboratory Technician
Performed quality assurance analysis of product.
Maintained accurate record of data in various formats.
|
|
|
1975 1976 Brigham
Young Univ. Provo,
UT
1976 - 1979 Oklahoma State
Univ. Stillwater,
OK
|
|
|
Recently Haskell
Univ. Lawrence,
KS AmeriComp Topeka,
KS
More recent study to update and enhance chemistry
skills. Successfully completed
Networking and Operating Windows 2000 Professional and Server as part of
the MCSE Win 2000 certification program.
|
|
|
1976 1978 Italy
Two years in Naples
and Rome as a representative
for a charitable organization.
Fluent in Italian.
|
|
|
Biking, running, dancing, camping, fishing, golf and technology
toys.
|
|
|
Available upon request.
|
|