Objective
Help clients make effective use of
ERP systems to improve their companys competitive advantage
Summary
Senior functional
ERP consultant and lead with 17 years PeopleSoft experience in a broad range of
supply chain, fulfillment chain and business applications. Services provided for clients with
operations in the United States, Canada, Mexico, England, Scotland, and France.
o
Business analysis; Productivity improvement
identification; Requirements definitions; Benefit measurements, Return on
investment calculations
o Implementations,
upgrades and troubleshoot engagements
o
Healthcare, energy, consumer products, manufacturing,
and service industries
Related experiences: Controller and cost accounting
positions; ISO certified companies; and Malcolm Baldrige National Quality Award
for organizational excellence.
Education
and certifications: MBA, PMP, and CPA.
Skills
Project
justification, planning and execution: Business analysis; Benefits/Cost analysis; Return on
investment calculations, performance
metrics; Requirements
definition and translation into project tasks; Work breakdown structure and work products; Resource
plans, roles and responsibility matrices; Risk assessments and issues
identification; Communication plan; Progress reporting; Subcontract proposal
preparation and scoring.
Implementation: Solution
prototypes; User interface fit/gap
and gap resolution; Customization functional specifications; Third party system
interface functional mapping;
Application software configuration: Conversions; Go-live cutover planning; Test
plans and scripts; Use case based test scenarios; Acceptance test program execution;
Knowledge transfer; Post go-live support.
PeopleSoft:
o Specialization:
Inventory, Purchasing, Cost Management (Accounting), Bills and Routings, and
Production Management modules.
Implementation support for Order Management and Customer Contract modules.
o Integration:
Order Management (items, reservations, shipping), Project Costing (purchasing
and inventory), Asset Management (purchasing and receiving), Accounts Payable
(voucher, match, post), and General Ledger (inventory transaction accounting, journal
generation and reconciliations) modules.
o Interfaces:
mobile data collection devices; industry specific third party merchandising, materials management, work order, and manufacturing systems.
Industries
Healthcare: Hospitals
Energy: Electric
utility and coal supply; Oil and gas construction & engineering
Extraction: Integrated metals mining, smelting and
formed products; surface coal and Lignite mining.
Consumer products: Food and beverage production and
distribution; Retail sporting goods and apparel; and Retail footwear.
Manufacturing: Medical
devices; Optical fiber; Network cable system assembly; Semi conductor;
Engineered to order and fabricated products; Print production; Electronic component
assemblers.
Services: Advertisement
Specialty; Educational test development, distribution and scoring services; Oil
field services; Catalogue publishing and mailers – integrated target
market materials and loyalty credit card statements; Wireless communications;
Marine transportation.
Education
MBA,
University of New Orleans
BA,
Accounting, University of West Florida
BA, Physics & Math, West Virginia University
Certifications
CPA
PMP
Memberships
Project Management Institute (PMI)
Society of American Value Engineers (SAVE) International
Healthcare Information and Management Systems Society (HIMSS) and Management Engineering and Process Improvement (ME-PI) Community
Presentations – West Virginia University, College
of Business & Economics, Department of Management Information Systems
Value of ERP Systems
Project
Management: Todays Challenges and Tomorrows Opportunities
BI - The
Business of Intelligence Has Never Been Better
What Healthcare,
Supply Chain Management, and IT Project Management can learn from each other
Experience
Vista
Consulting, LLC - 2001 to present – Senior SCM Consultant and Implementation
Lead
Vista Consulting offers ERP
implementation lead and functional consulting services to clients installing
PeopleSoft Enterprise supply chain management applications.
Served clients in the US, Canada
and Mexico. Engagements in the
utility, advertising specialty, wireless telecommunication, steel processing,
catalogue publishing, oil field services, industrial services, optical fiber,
medical device manufacturing, retail footwear and sporting goods, target market
print production services, and healthcare industries.
Accomplishments
o
Regional healthcare system with $8 billion annual
revenues. Business process analysis
of distribution center and facilities materials management function. Participated in the analysis of 15
hospitals (50 to 600 beds), heart and vascular centers, and a 1000-bed
university medical center.
– Conducted site
visits, interviews and observation of warehouse, facilities inventory and par activities
to access the effective use of space, people, equipment and technology.
– Developed
carrying and landed cost analysis framework to help client determine whether
internal central warehouse delivery or distributor direct shipments is the
better economic fulfillment chain strategy.
– Findings identified
improvements in the following areas: distributer distribution network; interfaces
between Lawson ERP, UPMCs Prodigo Marketplace, and GE Centricity EMR system; Optiflex/Omniflex
materials point of issue vs. point of use for billing and expense; contracting
and purchasing support for physician preference items; expired products and
recall management; consiged products; coordination between clinical and
materials services; Low Unit of Measure direct par deliveries; physical
counting practices; and utilization of mobile data collection devices.
o
Multi-region healthcare system with $16 billion annual
revenues. PeopleSoft version 9.1
go-live inventory readiness review and storage location configuration support
for multiple Critical Access Hospitals and a 700 bed designated trauma center
hospital.
– Materials
management scope: Stockrooms, fixed par inventory locations, and mobile carts
for: surgery emergency; obstetrics; catheterization; ICU; and orthopedics. Readiness review included wall-to-wall
inventory setup validation of legacy ERP system (Lawson) items, storage racks
and slots for conversion to new ERP.
– Used excel
spreadsheets to capture purchase item details for cross reference to manufacturer
ID and part number. Downloaded file
to label maker for immediate labeling of storage bins.
– Made
recommendations to change storage practices to reduce time nurses spent
searching for items and improve accuracy of on hand quantities.
o
Direct mail advertising
agency design, print services and retail credit card statement print companies. Lead for SAP inventory and purchasing
conversion to PeopleSoft 9.1.
– For each business line, detail requirement were prepared, sample
documents analyzed, and fit/gap comparisons to PeopleSoft were made. Total of 158 sales, supply chain and
accounting process use cases scenarios were identified, which became the basis
for implementation and test program.
– This activity resulted in the identification of interfaces between 3rd
party production management systems and PeopleSoft inventory, which had to be
added to the implementation, plans as well as a critical review of the SAP
conversion strategy.
– Demonstrated PeopleSoft inventory functions that included use of
PeopleSoft purchasing for direct shipments and subcontracted operations; lot
controlled materials; and landed cost features for international purchases with
standard cost profile. Performed
fit/gap with 3rd party supplier invoice imaging software and
PeopleSoft Accounts Payable voucher build interface. Determined that 3rd party
software was not able to support PeopleSoft Accounts Payable 3 way match rules
for multiple PO schedule level shipments.
Alternate solutions were developed to resolve gaps.
– Requirements phase documentation was incorporated into the project plan
to ensure that implementation activities were aliened with business
processes. The requirements
documents became the work package deliverables from which design documents,
activity estimates, resource matrices, test plans and training programs were
developed.
o
Retail sporting goods and apparel business with 130
stores. PeopleSoft in-place upgrade
from version 8.4 to 9.1. Track lead
for Purchasing, Accounts Payable and interfaces with retail merchandise (Island
Pacifics SCM and e-procurement punch-out system), and distribution center warehouse
management systems.
– Performed
reverse fit/gap analysis to identify customization to be upgraded.
– Performed
business process analysis and developed functional specification for custom interfaces
that created PeopleSoft Item master, purchase order, and purchase order change
records from 3rd party system import files. Customization strategy utilized
PeopleSoft Component Interface tools.
Supported technical team through design, development, test and cutover
phases.
– Performed
a business process improvement review of IT purchase order and supplier contract
practices and procedures to reduce requisition to dispatch time by making
better use of PeopleSoft functional features. Demonstrated the use of PeopleSofts Purchase
Order Contracts module. Implemented
AP xml voucher upload feature to reduce voucher input time for distribution of
shared service purchases to each store.
– Performed fit/gap with 3rd party supplier invoice imaging
software and PeopleSoft Accounts Payable voucher build interface. Determined that 3rd party
software was not able to support PeopleSoft Accounts Payable 3 way match rules
for multiple PO schedule level shipments.
Recommended options to resolve gaps for lease payments using purchase
order contract functions.
– Developed
a comprehensive test plan using HPs Quality Center 10.X (formerly Mercurys
Test Director) to manage the test program.
The program consisted of 3 test cycles based on business use cases and
transaction scenarios.
Approximately 150 cases representing each type of procure to pay
scenario were developed and tracked.
o
Global
specialty glass and ceramic company. Project Management Office project lead. Client maintains PMI based set of policies
and procedures governing project administration and the project life cycle. Emphasized managing risks and resources. Utilized the Mercury Quality Center for defect
management. Assignments included:
– SAP
reconfiguration of a manufacturing unit from a two-warehouse facility to a
single facility. The justification was to reduce the number of inter warehouse
transfer changes that production planners made because of numerous order rescheduling
requirements. The project had a
3,500-hout budget with internal and subcontracted technical and business team
members from the US and Europe.
Testing included user designed scripts that validated business process
interfaces between warehouse data collection systems and integration between
inventory transaction and general ledger.
– Technical
infrastructure project to re-host the PeopleSoft SCM system application data
bases, front end interfaces, and supporting systems from a legacy platform to a
high end environment that had the capacity and architecture for large-scale
business applications.
The project had a 3,000-hour budget and 6-month schedule. It required coordination of multiple IT
and business user community disciplines on a part time basis.
o
Integrated electronics equipment manufacturer. Production support services for
PeopleSoft 9.0 version.
– Resolved
problems with inventory and cost accounting transactions processed to the
general ledger.
– Services
included trouble-shooting errors, developing corrective action procedures and
training users to become proficient with the new functionality.
o
International retail footwear company. Business process analysis and corrective
action services to resolve accounting reconciliation problems with FIFO valued
inventory, replenishment, procurement, and fulfillment processes.
– Material
categories included marketing materials, operating report forms; employee
forms; and other administrative manuals supplied to franchise and company owned
retails stores.
– The values
of materials shipped were billed to each requestors store operating account
from completed material stocking requests. The work products included written
procedures to perform root cause analysis and knowledge transfer sessions for
these tools and procedures.
o
Advertising specialty industry Company. Implementation
consulting services. Client
produces hard goods, soft goods and printed materials from single product
focused factories to multi product line production facilities. Areas covered inventory, purchasing and
cost accounting functions for a 5-plant manufacturing operation.
– Requirements
definition activities included site visits, interviews with key stakeholders
and process owners. Participated in
corporate and plant accounting management to simplify work in process and
product line profit reporting by transferring responsibility from the GL to
subsidiary ERP Order Management, inventory and cost accounting modules. Work packages from this effort included
requirement lists with priority ranking, process flow documents, improvement
opportunities report and fit/gap with software.
– Performed
implementation activities for the Purchasing and Cost Accounting modules. Purchasing process improvements included
use of Advance Ship Notice – Receipts to provide electronic interface
with brokers/forwarders for availability of product components for sale;
Utilizing requisitions functions by consuming departments to streamline
procurement activities; and integrating purchasing with supply planning to
better match available to promise for the sales force.
– Cost
Accounting process improvements included implementing a standard Cost
Accounting system with product configured production order manufacturing.
Designed a product sales invoice margin reporting structure (reports matched
Order Management revenue distribution account codes with cost of sales Inventory
distribution account codes) that gave process owners the information to compare
sales invoice margin with general ledger margin for analysis and control.
– Completed
a comparison of PeopleSoft Enterprise version 8.8 to version 9.0 to determine
the impact on the business of upgrading the financial, distribution chain and
supple suite of installed modules.
The assessment included review of version 9.0 bundles 1 –13 and
side-by-side comparison of configurations, views and processes for Inventory,
Purchasing and Cost Management modules.
o
Catalogue print publishing company. Business process analysis, fit/gap, and
conference room pilots.
– Evaluated
PeopleSoft Enterprise 8.8 supply chain modules for the production equipments
MRO (maintenance, repair and operations) activities.
– Documented
9 MRO business processes and demonstrated PeopleSoft inventory, purchasing and
accounts payable functionality for each.
Identified gaps and prepared issues list for business case
development.
– Demonstrated
actual transaction examples for PeopleSoft SCM modules functions and
integration features: procure to pay; replenishment and fulfillment processes;
and vendor managed inventory.
Integration demonstrations included posting transactions to GL and
landed cost extract processes to show impact of PPV, freight and taxes on
inventory unit costs.
o
Integrated mine, smelter, and metal products company.
Implementation and customization
consulting services. Deployed SCM
and manufacturing modules in a process industry using PeopleSofts by-product
and co-product functionality.
– Requirements
were to so that separate divisional profits from inter unit inventory transfers
at transfer prices could be reported while allowing elimination of profit upon
consolidation. Services included
configuration validation of multiple cost profiles, inter unit inventory
transfers, cost accounting transaction rules, and inter unit pairs.
– Tested
billing, invoice configuration, and distribution types so that GL margin
analysis reporting could be made for products sales. Created special bill type and Revenue
distribution sets for tolling sales.
– Additional
services were the design of reconciliation procedures for WIP to finished goods
inventory; troubleshooting modifications to delivered production control
processes and PeopleSoft;
One on one training of inventory and purchasing employees on how to use PeopleSoft;
and competency center support during test deployment and production phases.
– Developed
functional customization specifications to back flush lot controlled
component quantity transfers from raw materials inventory to production to
eliminate extra steps performing same function from Materials Issue process.
– Provided
tier 2 support for Supply chain and Order Management modules.
o
International lodging and resort company. PeopleSoft
Enterprise version 8.8 upgrade assessments for the architectural and construction
business unit.
– Objectives
to be realized were reductions in implementation costs by utilizing delivered
functionality to replace customizations and delivered interfaces for 3rd
party systems. Business processes
included subcontracted activities; procurement activities; facilities furniture
fixtures and equipment configuration; and guestroom and shared space
construction and outfitting cost estimating.
– The
assessment involved a review of current processes documents, process flow
diagrams and discussion of activities with stakeholders. Matrixes were developed to identify
likely PeopleSoft processes that could provide future state solution
benefits. Modules fitting client
business processes were Bills and Routings, Procurement, Product Configuration,
Product Costing, and Project Accounting.
o
Telecommunication company retail wireless
communication business. Consulting services for PeopleSoft supply chain and
retail store implementation.
– The work
included replacement of legacy systems retail inventory management systems with
PeopleSofts version 8.8 Enterprise procurement and inventory modules. Services
provided included fit/gap analysis, PeopleSoft 8.8 purchasing, Inventory, and
general ledger module configurations, and store/ kiosk replenishment rules
setup. Provided best practice strategies for interfaces between PeopleSoft, third
party point of sales applications, and third party supplier systems. Equipment and accessory supplier
interface transactions required significant customization to conform PeopleSoft
export records to suppliers system for retail outlet drop shipments.
– Significant
effort was devoted to utilizing delivered EIP, EDI and Component Interfaces to
process 3rd party transactions into PeopleSoft as well as testing,
and training retail store personnel using showroom kiosk facilities for the
instruction sessions. Track and
trace reports were developed to follow cell phone movement by ECN from purchase
to sale as well as return to warehouse, and restock refurbished units.
o
International service and specialty equipment
manufacturer servicing the energy industry with $640 million annual revenues. JDE
to PeopleSoft conversion project. SCM modules included Inventory, Order
Management, Purchasing, Manufacturing, Supply Chain Planning and Cost
Management. Primary consulting
responsibilities were subject matter specialist for Order Management and Cost
Management.
– Implementation
activities included analysis of current business processes, configuration of
PeopleSoft version 8.8, integrated conference room piloting of business
processes utilizing PeopleSoft functionality, development of unit and process
test scripts, rewriting test scripts to fit client end user training
documentation formats, conducting train-the-trainer exercises, assisting client
trainer in classroom instruction and providing post go live support.
– The Order
Management deployment mode was integrated with PeopleSofts Contract
Administration and Project Costing modules to feed inventory demand from
contract controlled sales orders and capture manufactured product costs at time
of shipment for the clients long-term agreements. Order Management quotation functionality
was utilized for non contract RFQs when the client was bidding on short
production cycle make to order products.
– PeopleSofts
Cost Accounting application was configured with the Average Cost profile to fit
the clients need for valuing inventory by the weighted average cost method for
purchased and manufactured items.
Actual resource time and rate options were selected so the client could
apply the average cost policy to manufactured products. Specialized training exercises
were developed to show accountants the tools and techniques available in
PeopleSoft to reconcile finished goods and work in process accounts, using the
average cost profile, with the general ledger control accounts.
o
Investor owned multiple state electric transmission
and distribution companies with 3 million customers. Inventory and Cost Management lead
– The
project included simultaneous installations of PeopleSoft financial; order to
cash; procure to pay; and supply chain interfaces with Seven Trent STS Storms
work order management system and Manhattan Associates warehouse management
system. Inventory configuration
included 150 par inventory locations linked to multiple distribution centers
with configured networked sourcing and replenishment rules. Developed functional specifications for
charging par inventory consumption to capital projects and designing a sales
and use taxes modification for inventory transactions between the service company
warehouses and operating companies.
– Responsible
for Order Management, Inventory and Strategic Sourcing implementations for a 8
million pound processed metal, baled paper and recycle parts materials recovery
business unit. The tasks included
development and execution of work breakdown structures for the process design;
system configuration; conference room pilot demonstrations; and product and
business process test scripts.
Utilized Container Management functionality for tracking scrap movement
between collection points and the processing center. Adopted delivered PeopleSoft inventory
functionality to the processed metals operations without using the
manufacturing module. The Strategic
Sourcing module was modified to accommodate bidding activities associated with
sales of recovered materials.
– Performed
Cost Management configuration, Conference Room Pilots and testing activities.
Utilized inter company expense charging functionality to record cross ledger
inventory issues to operating unit cost centers. Developed reconciliation processes for
inventory that included purchase order price variances and Accounts Payable
landed cost variances. Provided
audit knowledge and skills procedures to use PeopleSoft for reconciliations of
inventory quantities and unit costs posted to the general ledger.
– Participated
in end-to-end business process quality assurance program and corrective action
system that included the development of over 500 test scripts, the direction of
test team activities, documentation of errors, resolution of problems and
redundancy testing of corrections. Tested
customizations developed by offshore technical team and communicated corrective
action to fix programming defects.
– Worked
with the clients training department to convert the test scripts into training
documents and desk procedure reference books for training of warehouse
personnel. Prepared training
guidelines and syllabus; helped client match personnel position descriptions
with appropriate PeopleSoft functional skill requirements and determined
prerequisites for attending classroom training. Utilized UPK tool set for introduction
and pre qualification of job training programs.
o
Integrated steel manufacturing enterprise. PeopleSoft supply chain solution
demonstration, bid package preparation, and order of magnitude implementation schedule
preparation:
– The
solution included a fit/gap report for replacing legacy system sales order
entry, WIP, inventory, and costing schedules with PeopleSoft's order
management, cost management, inventory, bills and routings, and production management
functionality.
– Key
PeopleSoft functionality that was utilized to demonstrate gross margin controls
in order management, lots, by-products and co-products.
o
Public owned 750 thousand customer electric utility transmission,
and distribution company. Project
lead for full life cycle implementation of purchasing, inventory (including Par
functionality) and materials requirements forecasting tool.
– The
project included integrating with Seven Trent STS Storms work order management
system for demand planning, installation of mobile data collection hardware and
software (High Jump) systems for warehouse operations, development of custom
material requirements forecasting tool for purchasing.
– Worked with client procurement department to develop bid
packages for third party suppliers of software and hardware. Activities included development of
performance based requirements criteria, vendor score cards and progress
payment compensation formulas based on milestone completion for contracted
services.
– Significant
time was devoted to test script design based on use case scenarios so that the
same document used for validating system performance could be used to train end
users. The project scope included interface bi-directional data transfer, cut
over strategy and migration of legacy data. A triple test standard was adopted for
all processes, including requisitioning, buying, issuing, payment, material
movement, costing, posting to ledgers and charging to projects, to ensure 100%
reliability at go live.
– New
functionality implemented within PeopleSoft Inventory were expanding the ship
on behalf functionality to direct charge different general ledger projects with
warehouse issues and returns without having to do inter unit inventory
transfers, and provide localized chart field department ID validation for
separate set ID defined accounting ledgers.
nSight,
Inc. - 1997 to 2000 – Implementation consultant
nSight was a certified PeopleSoft
implementation partner. Primary
responsibility was providing consulting services for distribution chain, supply
chain, and manufacturing clients.
Clients located in the US and
Europe. They included industrial
equipment manufacturer; distilled spirits and wine processor and bottler;
non-perishable and perishable food processor; achievement test developer,
publisher, distributor and scorer; custom envelope manufacturer; and semi
conductor manufacturer.
Accomplishments
o
Participated in a manufacturing and supply chain
implementation that included Red Pepper and interfaced shop floor data
collection systems.
o
Utilized proactive project change management
techniques to help clients meet go live dates and stay in budget. Engagement practices resulted in
expenditures remaining within 5% of authorized funding.
o
Consulting support to adopt PeopleSoft's Cost
Management functionality to a 600-task routing semiconductor manufacturing
process. The solution allowed the
client to continue using current costing practices with PeopleSoft and
simplified the cost management configuration to one cost rate for all products.
o
Provided inventory cut-over strategy and consulting
support which enabled clients to match legacy system closing valuations with
PeopleSoft opening balances for raw materials, work in progress and finished
goods. Helped clients minimize
conversion write-offs and ensure consistent product costing.
o
Developed functional specifications for Weighted
Average Costing modification to PeopleSoft's standard cost method for
manufactured items. Functionality incorporated into PeopleSoft's Euro pack ERP
product line.
o
Participated on the PeopleSoft pre release program as
a member of the Order Management team.
Business
Systems Sales and Consulting. - 1994 to 1997 - Business Process Analyst and
Software Implementation Consultant.
Clients included semi conductor
equipment manufacturers; electronic component assemblers; industrial product
equipment manufacturers; and apparel industry wholesale suppliers.
Accomplishments
o
Develop benchmark performance measures and implement
system localization for international equipment rental and product sales
company. The project resulted in
greater profit performance from operating units and a 25% reduction in overhead
costs by redistributing administrative activities to lower cost operating
units.
o
Applied end user database applications to implement
an integrated customer contact, quotation, order entry, purchasing, and
tracking system for a multi product line company with outsource
production. The effort resulted in
a 50% reduction in quote and order cycle time and a 25% increase in revenues
per employee.
o
Developed affiliated ledger receivables and payables
accounts reconciliation and settlement program that enabled corporate financial
personnel to match related entity billings and identify missing
transactions. The program
significantly reduced the time to verify financial information and increased
operating unit accountability.
American
Bureau of Shipping, Inc. - 1991 to 1994, Financial Reporting Manager
Responsible for financial
reporting of a marine transportation services and vessel certification company
with global operations.
Accomplishments
o
Project lead for implementation of worldwide billing,
accounts receivable, cash management and financial system. The initiative was centrally coordinated
but distributed responsibilities for localization and implementation. The solution was proto-typed in the US
and rollout to principal sites in South America, Europe, and Asia. Key performance drivers were daily
consolidated accounts receivables; daily financial institution cash reporting;
universal service billing codes; multiple currency service contract reporting;
dual currency financial and operating statements which met local, US GAAP and
taxing authority rules.
o
Developed procedures and coordinated the document
control and managed the change process for the accounting department which
conformed to ISO standards.
Participated in the initiative to receive the Malcolm Baldrige National
Quality Award for organizational excellence.
o
Designed and installed an on-line, dual currency
accounts receivable tracking and statement generation system which resulted in
a 33% reduction in over 90 day receivables in the first year of operation and
$5 million in 18 months.
o
Implemented a point-of-service, multi-currency and
multiple locations billing system that reduced invoicing time by 67%.
Utility
Fuels, Inc.- 1983 to 1990 – Controller (Division of Reliant
Energy, formally Houston Lighting and Power)
Responsible for a coal
transportation and supply business unit financial and operational reporting.
Managed a staff of 40 professionals and specialists. The financial services provided were
payroll, accounts payable, customer billing, project accounting, fixed assets,
financial and regulatory reporting, budgeting, operational reporting and income
tax.
Accomplishments
o
Directed the financial reporting function that
resulted in unqualified audit opinions and a minimum of quality weaknesses.
o
Evaluated and implemented integrated services
business software system valued at $1 million that reduced workflow time by
30%.
o
Simplified accounting activities that saved one
person-month of work and eliminated most of the overtime.
o
Participated in the creation of an operating unit's
business plan and performance goals that resulted in improved customer service,
increased employee cooperation and shortened transaction cycle time.
o
Member of information system development committee
responsible for preparing the companys information system master plan. The plan objectives facilitated faster
operating and performance reporting by reducing processing time by 30%.
McDermott
Intl, 1974 to 1983 – Project Accounting Supervisor, Contract
Administrator
McDermott Intl is an engineering
and construction services company in the oil, gas and petrochemical processing
industries. Responsibilities
included operational accounting, contract administration, cost
estimating, and business process analysis for offshore production platform
manufacturing and
engineered products divisions including air-cooled heat exchangers.
Accomplishments
o
Coordinated the implementation of a time entry,
payroll and labor distribution system for a multiple site business unit that
resulted in lower support costs by eliminating duplicate data entry and
activities.
o
Participated in contract negotiations for engineering
services and construction projects.
Acme
Marble and Granite Co. - 1973 to 1974 - Cost Accountant
Responsible for reporting
financial progress of long-term contract revenue and profits for precast
concrete engineering and contracting company. Prepared job order cost accounting
subsidiary records and reports from incomplete source documents.
Price
Waterhouse & Co., CPA's - 1972 to 1973 - Auditor
United
States Navy - 1969 to 1972 - Aviator