Laura Coffa

SWB Consulting, Inc.

laura@swb-consulting.com

415.543.5825

 

 

 

WORK EXPERIENCE

 

Nov 2000 – Apr 2002                    Senior SAP Support Team at Stola S.P.A Turin, Italy

 

Stola is a group of seven legal entities with about 200 SAP users.

 

SAP Release: 4.6B

 

Work details:

  

BC -  ABAP/4 Developer:

Batch Input for transaction        ME32L, change scheduling agreement

                                                        FI01, create bank

                                                        MM02, change material

                                                        MM01, create material

                                                        CJ42, change revenue planning

                                                         FB09, FI- change line items

                                                         MB1A, Enter goods Issue

Data is extracted from Excel and ASCI formats and stored as UNIX file which is used as SAP input file.  Custom procedure for purchase requisition: store the input file as UNIX > create the material > call a program to prepare input for standard direct input  RM06BBIO.

 

BC -  ABAP/4 SAPscript:

SAPscript modules for the message NEU, LPET (MM) , ZRD0, ZLD1, ZLD0 (SD: Outbound delivery,      Billing), MBXA.

 

Creation of SAPscript forms, modification of standard applications, message modifications

Off-standard modification by changing the “advance purchasing” document print, print of all date for Purchase orders for external service using BAPI_PO_GETDETAIL, etc. Management standard text: logo, digital signature, text.  Send message by fax (top call), customizing SAP RFC for send message directly by fax using Topcall.

        

BC – Report:

Developed following PS/MM/CO/SD reports in ABAP4:

WBS invoice for customer, SD: WBS order/quotations, invoiced for WBS, delivery not invoiced, analysis purchase order, requisitions, etc

 

ABAP query, for MM, FI, PS module.

Report Painter: project reporting, project cost element, PCA reports, internal orders, cost center.

 

BC - User exit:

ZGGBR000 User exit for validation FI

ZGGBS000 User exit for Substitution FI

USEREXIT_SAVE_DOCUMENT_PREPARE in program MV45AFZZ for quotation SD.

 

      BC: System Administration :

      Administration:

System Message, local client copy, system monitoring, lock entry, dump analysis, background job, manually backup, CCMS, SAPDBA.

User Maintenance / Authorizations :  mass user maintenance, activity group, profile. transport management system ( transaction STMS): import, add, forward system, management queue from system file: cofile - data.

 

     CO Module:

                                    Define controlling area, define master data for cost element/cost element groups , define cost

                                    element reports, define posting rule, period lock, cost center ( define cost center, planning cost,

                                    period end closing,  cost splitting, period allocation, reports), profit center; actual costing; period-end

                                    closing.

 

     FI Module:

     Define master records: bank, account, number range, field group, validations, substitutions, posting

     periods, help desk end user.

 

     MM Module: Help Desk: purchasing, report.

 

Feb 1999 – Nov 2000   SAP Consultant for Ernest & Young

              

      Work details and Projects:

 

                      FIAT FERROVIARIA

      Understand and analyze end user needs and propose viable solutions for report improvement, QA and user training in CO, PS.  Reports were developed using ABAP/4 developer by Report Painter including drilldowns, queries, and ABAP/4 scripts.

               

FIAT GESCO:

Upgrade release  3.1 – 4.5

                                     QA and fixes on all custom procedures, reports and transactions SPAU, SPDD.

 

                                      COMAU SERVICE

                                      CO Junior consultant

                                      Customization: cost element account, hierarchy, cost center, activity type, actual posting, period end

                                      closing.

                                      Taught end-user training course:-- CO-CCA/PCA

 

                                      FIAT GESCO

                                Help Desk activity CO/FI Module; End User Training in CO

                                     

                                      FIAT AVIO

                                Abap/4 developer for module FI/CO/PS

     Accounting QA, fix implementations and reporting

 

 

Jun 1998 – Feb 1999    Consultant at BANKSIEL S.p.A

                                         

COBOL, PLI developer at San Paolo IMI   Institute

Software adaptation to the Euro currency

 

 

 

 


COMPUTER KNOWLEDGE

 

Languages     ABAP/4, Cobol II, PLI, SQL, C, CICS, Pascal

 

Data Base      DBII, ORACLE

 

OS                 Windows (User), Unix/Linux (User)

 

SAP R/3         FI, CO, PS, BC  , Report Painter and Abap Query, SAPscript

 

Other              ROSCOE,  DEVELOP 2000, OS/400

 

 

EDUCATION

 

Nov 1997 - Jun 1998       Course post-graduate: COBOL II, SQL, CICS ,DB2, ORACLE

 

Feb 1999 - Jun 1999        ERP SAP R/3 Training  Financial (FI), Controlling (CO)

 

Jan 2000                              ERP SAP R/3 Training at Sap Italy Project System (PS)

 

Feb 2001                             ERP SAP R/3 System Administration basis

 

 

LANGUAGES

 

Italian native

English fluent

French  fluent

 

 

 

 


REFERENCES

 

G. Babini

Director of Information Technology                      gbabini@stola.stola.it

 

R. Mangione

SAP Manager                                                        techne@focos.to.it

 

S. Baerend                                                                sebastian@swb-consulting.com

CEO, SWB Consulting, Inc.

 


Member number:7416
Additional Contact information is available on the Information Page.
Software Contractors' Guild (www.scguild.com)
Copyright(c) 1995 - 2001 laura coffa and Software Contractors' Guild, Post Office Box 257,Nottingham, NH USA 03290-0257