TEJ S. PATRI

630-430-9126 (c)

11608, Legacy.dr, Plainfield, IL

 

 

SAP SENIOR CONSULTANT

 

SUMMARY

 

·        8 Years in SAP R/3 Implementation

·        Strong experience in IS-U/CCS implementation in Device Management and IDE.

·        Expertise in SD/MM/PP/FI/HR modules of SAP vis-à-vis. Fictional & Technical design and implementation with Upgrade experience.

·        Assist in defining and analyzing client business requirements and objectives

·        Serve as team lead assisting clients in the configuration of the SD, LE, SM, MM, WM modules to meet business requirements

·        Familiar with the integration between Project Systems, Production Planning, Sales & Distribution, Finance, Controlling, and other R/3 modules vis-à-vis Business systems design, Architecture and Interfaces.

·        Experienced in R/3 Release 3.1 x, 4.0x, 4.5x, 4.6x ,4.7, ECC 6.0

·        Familiar with the ASAP implementation methodology and tools including the Implementation Assistant.

·        Experience in Business Reengineering, Gap-Analysis and blueprinting, training, testing, Development (Writing Technical specs for ABAP/4 reports) and Upgrade

·        Experienced in Writing Functional Specs for ABAP Codes, Data Migration, Conversion Programs, and Interface Specs for Uploading DATA from Legacy. Worked on Interfacing tools like XI , GIS (Gentran Integration Suite)

·        Experienced in Writing Specs for Unit Testing, Functional testing, Integration Testing and System Roll Out.

·        Experienced in User Exits for EDI (Order Management, Shipping, Transportation, Billing & Vendor Managed Inventory).

·        Provide Techno -functional guidance and expertise in the execution of SAP product usage.

 

PROFESSIONAL EXPERIENCE

 

Ø      Jun ‘07 – Present – Consumers Energy , Jackson, MI

                      SAP IS-U/CCS IDE Business Analyst – ECC 6.0

 

·        Worked specifically for Techno-Functional analysis on Meter Read Download, Meter Read upload & Meter Read Re-Routing (between SAP and a third party software ARCS). The client was replacing their old Meter Maintenance system ITRON with NEPTUNE and had specific testing and design issues with the above said interfaces. Worked on IDoc analysis, design and troubleshooting.

·        Worked on set up, design and implementation of Workflow requirements for Notification processing and Error handling requirements.

·        Used workflow parameters (Task Group TG20000016, Business Object BUS2080, Std Tasks TS20000549 & Role AC00000178) to integrate with Workflow template WS20000318.

·        Designed a PDORG structure and set up of automatic email trigger to Lotus notes from SAP Inbox.

·        Worked specifically on trouble shooting BPEM (Business Process exception Management ) and EMMA case requirements

 

Ø      Nov ‘06 – Apr ‘07 – New York Power Authority, White Plains, NY

                     SAP IS-U Device Management Business Analyst – ECC 6.0

 

·        Worked as Device Management Lead to cater and support the Blue Printing requirements of the project.

·        Responsible Interface design and Mapping between Third party systems and SAP using IDocs for CCS requirements.

·        Worked on Interface design and Analysis in the areas of Device Management.

·        Worked on requirement analysis and solution design to cater to specific requirements of the client in Consumption Data Collection, Meter Reading, Rate analysis, Data Modeling of process flows with emphasis on Interface requirements VIS-À-VIS Business and Technical Master Data for the ongoing realization phase of the project.

·        Worked on interface architecture and process flow design in the areas of Device Management and Billing involving Techno-Functional analysis of specific requirements of the client. NYPA has a specific requirements to conduct their day-today business with Con Edison of New York in the areas of Device Management and Billing.

·        Conducted and trained Devise Management Process Education Work shop for requirements analysis and Blue print design.

·        This is a full life cycle Implementation and currently in the Realization phase of the project.                             

 

Ø      Mar ‘06 – Sep ‘06 – SOLOCUP , Chicago , IL

                      SAP EDI/ Lead Business Analyst

 

·        This was a lead role to implement EDI requirements and managed a team of consultants to implement and design XI Requirements in SD, LIS, MM and Manugistics requirements.

·        Was responsible for all the Interface architecture and design with emphasis on Techno-Functional requirements.

·        Managed a team of Outsourcing consultants based out of India and Spain to Implement the Solutions.

·        Worked on a number of IDocs for Techno-functional analysis and Mapping requirements for Manugistics, MM, PP and SD requirements with strong integration requirements with FICO.

·        This was a full life cycle implementation with aggressive deadlines.

 

Ø      Apr ‘05 – Jan ‘06 – American Water , Voorhees, NJ

                      SAP IS-U/CCS Business Analyst

 

SAP IS/U CCS Implementation

·        Device Management position responsible for problem solving and issue resolutions with work areas connected to Billing and Plant maintenance. This was a production support role with responsibility on problem solving and issue resolution to support day-to-day operations

·        Worked on Notifications and Work orders and Material Management integration and requirements. Worked on implementing new changes to the existing Data Model and Master data architecture.

·        Extensively worked on IDE issues and problems related to Device Management and Billing.

·        Worked on IDoc data analysis and Interface design and architecture to implement new functionalities.

·        Implemented and worked CRM BDOCS and IDE requirements to interface and integrate with front end CIC requirements.

·        Worked on Master data requirements and data upload techno-functional requirements.

 

Ø      Jan ‘04 – Mar ‘05 – Cadbury Schweppes , Morris Plains, NJ

                      SAP Business Analyst/Team Lead

 

·        Working as a Technical/ Business Analyst (handling a team of programmers and users) to design and develop interfaces and Reports in the areas of Manufacturing, Finance and EDI in SAP.

·        Identify the test scenarios to write the test scripts required for the Unit testing, Functional testing and Integration Testing, User acceptance test.

·        Identify and prepare training scripts for end user training and Super user training.

·        To Design and Develop the Prototypes which would be suitable to accommodate all the various Business Functions of the Group

·        Responsible for Design, Architecture and Implementation strategy for PP, FI, VMI (Inventory) and EDI interfaces.

·        Worked on Account Roll-ups, Accounts Receivables (BAPI-Ale) and General Ledger & Banking EDI/ALE interfaces.

·        Designed and delivered most of the interfaces from Scratch to Production. Responsible for Data conversion, Migration and Gap Analysis of all Legacy systems and 3 rd party systems to and from SAP.

·        Worked on GIS to design and develop EDI interfaces for Third Party Inventory Management systems (RYDER) and SAP.

·        Worked with enhancements and IDOC types WMMBID02 (Goods Movements), SDPIOD01 (picking data), WMIVID01 (Inventory count data and data entry), WMTOID01 (Transfer orders) & SDPAID01 (verification of picking unit).

·        Was responsible for designing an enterprise wide strategy to set up and Implement interfaces using Right Fax.

·        Worked on set-up and design of the Right-Fax solution to cater to specific requirements of the client using Output determination in Inventory Management.

·        Designed and Implemented interfaces for Shop floor production Orders, Goods Receipts and Goods Issue interfaces using SCADA (Supervisory Control and Data Acquisition) tool along with SAP. Was responsible for the whole process design and deliverables.

·        Designed and Implemented Bar-Code Label printing interfaces with SAP for the Global Canadian Roll-out of the project.

·        Worked on conducting a cost-benefit analysis for using new technologies for a seamless integration with SAP’s RFID. Worked on designing the architecture for RFID and Bar-code Label printing for Logistics Execution in SAP.

·        Worked on trouble shooting, process design and execution of APO (Advanced Planning Optimizer) system.

·        Worked on Functional design, mapping and data transfer requirements between APO, SAP & VMI. Presently working on unit testing the APO process in preparation for the Canadian go-live.

 

Ø                                    Jul ‘03 – Jan ‘04 – Tilia , Sanfrancisco , CA

                      SAP EDI Lead Interface Team Lead

 

 

Ø      Apr ‘03 – Jun ‘03 – Sacramento Municipal Utility (SMUD), Sacramento,CA

           SAP IS-U CCS Techno-Functional Analyst

 

·        Worked on Process Design and Analysis for upgrade to SAP Enterprise release from Release 4.0b (SAP) and 1.x (CCS).

·        Worked on Feasibility Analysis and design guidelines to implement SAP CRM solution. Designed and Developed interfaces with back end CCS system to Interface with front-end CRM for CIC requirements using BDOC’S. Evaluated and worked on performance issues and other interface dependencies for BDOC’s.

·        Worked on process automations for Billing, Device Management and CRM for upgrade to Rel 4.71.

·        Worked on Business Partner clean up and Hierarchy design to cater to specific requirements of the client.

 

SD Functional

·        Worked on aligning the SD system with customer requirements. This involved Progressing back orders, distributing the ATP quantities, Redistributing confirmed order quantities and Inter company Business Processing.

·        Worked on Sales support requirements. This involved Master Data for Sales Support, Sales prospects and Optical archiving with Sales support.

·        Worked on customizing control for Sales documents. This involved configuring control elements for item categories, incomplete documents; Blocked documents blocked billing documents etc.

 

 

Ø      Dec ‘02 – Mar ‘03 – City Public Service , SanAntonio,TX

                      SAPScript, Barcodes & CCS Consultant

 

·        Worked on CCS Business Partner transfer for importing SD customer data into the Business process.

·        Worked on Requirements gathering, Gap analysis & Process Design to cater to specific requirements of the client with respect to the Business Process.

·        A member of CCS team to provide techno-functional support.

·        Worked on Device management with Master data on issues like creating reference categories with and without reference to a Material, Device categories and customizing and Device Management integration with Logistics.

·        Defining Master data functions relevant to billing, Creating Billing Master data in the system and Establish customizing settings for billing and Invoicing Master data and FI-CA integration requirements.

·        Areas for Functional design analysis included Scheduling, Connection Objects, Service connections. etc.

·        Designed and developed Technical & Functional Specs for Barcode printing for all CCS requirements and print workbench.

·        Strong experience to Device management & Billing aspects of CCS (Design, Configure &Testing.) like Rates Design, Rate types & allocations etc.

·        Worked on aspects like maintaining facts of a rate, Create a New rate for consumption billing (electricity),Create new schema & New rate category, Create a new billing schema.

 

Ø                              Jul ‘02 – Dec ‘02 – LVMH ,Springfield, NJ

                 SAP SD/ EDI Lead

 

 

 

Ø                        Feb ‘02 – Jul ‘02 – DuPont, Wilmington, Delaware

                 SAP MM/QM/PP Interface Design Lead

 

.

 

Ø                        Aug ‘01 – Jan ‘02 – Nissan, Smyrna, TN

                SAP/AP/SD/PP Design Team Lead

 

 

Ø                        Feb ‘01 – Jun ‘01 – Pactive Packaging  , Lincolnshire, IL

                 SAP ABAP/ALE/IDOC/EDI/ MM/SD Consultant

 

 

Ø                        Jun ‘00 – Jan ‘01 – PSE&G ,Newark, NJ

                 SAP HR/SD/MM/PP ALE/IDOC Team Lead 

 

 

 

Ø                        Mar ‘00 – Mar ‘00 – Neptune-Partsriver ,San Jose, CA

                 SAP ABAP/BAPI B2B Consultant

 

 

 

Ø                        Jun ‘99 – Feb ‘00 – Sterling Commerce, Toledo, OH

                 SAP ASAP Integration Architect

.

 

Ø                        Dec ‘98 – May ‘99 – National Panasonic, Secaucus, NJ

                 SAP ALE/EDI Consultant

 

 

Ø                        Jan ‘97 – Nov ‘97 – Mahindra & Mahindra Group, India

                 SAP Consultant

 

.

 

EDUCATION

 

Bachelor of Science (Electronics), India

Graduate Member All India Management Association, India

Diploma in Materials Management, India

 


Member number:9932
Additional Contact information is available on the Information Page.
Software Contractors' Guild (www.scguild.com)
Copyright(c) 1995 - 2006 Tej Patri and Software Contractors' Guild, 3 Country Club Dr., #303, Manchester, NH USA 03102